PLI RPLI MAXIMUM LIMIT OF SUM ASSURED ENHANCED
PLI Directorate has revised the maximum sum assurance limits - from Rs 10 lac to 20 Lac in respect of PLI
- from Rs 3 Lac to 5 Lac in respect of RPLI
with effect from the date of issue of notification no 25-3/2003-LI dated 17.01.2012
Click here to download the Directorate notification